Slow morning with some laundry (the towels were starting to smell). Long breakfast with part of my team, and at the end, just me and my team lead, Joe. We walked to our office together and talked about a lot of different things, an interesting walk.
At the trailer, I started to verify blog posts. A long and tedious process. There are more mistakes than I would like there to be; we really should have had a proper training for the whole group that is publishing the posts. Note until next time.
Day went by with roughly the same stuff as usual, and at 19 I suddenly was in a hurry, the Swedish IST (International Service Team, volunteer crew) and CMT (Contingent Management Team) would take a picture together at 19:30 in Echo. Quick walk back and then change into the official shirt and neckerchief from Sweden.
Took a while before everyone was in place, and we sang some songs while we waited. After the photo, I went to dinner with two of my tent mates, Henrik and Per-Martin, along with a guy named Sören. The nice thing about the late dinner is that the line is pretty short
I taught the same guys Gurka, and finally, I actually won! Now lying in the bed, listening to the concert going on at the Echo stage. Since I hear the music rather well, I will imagine it’s quite loud at the stage.



